Enregistrez-vous
ARMATEURS PASSES
ARMATEURS PRESENTS
NAVIRES MARCHANDS
NAVIRES MILITAIRES
OFF-SHORE
AUTRES IMAGES

Précedente Suivante |
![]() |
State of Maine |
Nave scuola State of Maine (ex USS Tanner 02) attraccata a Tenerife il 06/06/03. Fonte: wikipedia SHIP SPECIFICATIONS Type of Vessel: Public Nautical School ship Owner: U.S. Maritime Administration (MARAD) Length Overall: 499.83 feet 152.35 meters Breadth: 72.00 feet 21.95 meters Depth: 42.00 feet 12.80 meters Main Engine: Medium Speed inline 6-cylinder diesel engine Make: MAK Auxiliary propulsion: Reliance Electric Motor Propeller: Lips Controllable pitch Full ahead sea speed: 15.3 knots SHIP HISTORY Former Name: USNS Tanner TAGS-40 Namesake: Capt Z.L. Tanner, USN, 1833-1906 Keel laid: 22 September 1986 Launched: 28 August 1990 Operator: Military Sealift Command, 1990-93 Conversion by: Interocean Ugland Management Corp., Voorhees, N.J. as General Agent for the U. S. Maritime Administration The USNS Tanner TAGS-4O was built for the Navy as a fast Oceanographic Research Vessel by Bethlehem Steel Corporation at its Sparrows Point yard in Maryland in 1990. The vessel was the second oceanographic research ship to bear the name of Zero Luther "Tanner" a noted Oceanographer and inventor of a patented sounding machine. The vessel experienced an engine casualty in 1993 and was laid up by the Navy and ownership transferred to the Maritime Administration. She lay idle in the James River Reserve fleet until 1996 when she began a conversion process, which removed her underwater sonar domes and equipment. The (2) two original engines were removed and a new "one of a kind" power plant was installed, making her into a sophisticated high tech teaching platform for her mission of training men and women for careers as licensed officers in the Merchant Marine. The vessel was modified to increase the accommodations from 108 to 302 persons. New lifesaving equipment and upgrades to existing equipment were accomplished as well as enhancements to the habitability requirements of the vessel. She was delivered to Maine Maritime Academy on 6 June 1997 and sailed on her maiden training cruise the following week. |
Username | ![]() |
Armateur | Maine Maritime Academy |
Ship manager | |
Numéro IMO | |
Type de navire | |
Année et chantier de construction | 1989 Bethlehem Sparrows Point Shipyard Inc. - Sparrows Point |
Date | 06/06/03 |
Lieu | Tenerife |
Téléchargée le | 19/06/2011 |
Dimension | 1216 x 800 |
visites | 1190 |